1987 Sediment Dam Built
June 1, 19871997 Johnston Ridge Opens
May 13, 1997The reconstructed 52-mile-long Spirit Lake Memorial Highway opens to traffic, connecting Castle Rock to stunning viewpoints in the blast zone.
The reconstructed 52-mile-long Spirit Lake Memorial Highway opens to traffic, connecting Castle Rock to stunning viewpoints in the blast zone.